Ardiente – Corrective action to remediate extensive site soil compaction issues. Demo pool concrete, excavate 3’ down, replace with type 2 around two existing swimming pools and mature palm trees. Install new pool deck and drainage system with lift station. Remodel of swimming pools to include new plaster, tile, lighting, drains and skimmers.